- Substructure: beam 250 x 50 mm
- Material: aluzinc 0.5 mm, Arcelor Mittal, Germany
- Water-proof foil: Metalroof 120, 120 g/m2, Eurovent, Poland
- Heat insulation: basalt wool TechnoNIKOL, 30 kg/m3
- Roofing type: standing seam roof
The roof of a four-story building with arched windows on Blvd. Shevchenko, 18, which is now occupied by Ukrtelecom. In the middle of the 19th century, the Kyiv gymnasium No. 2 operated here. Our company has carried out works on the dismantling of the old roofing, renovation of the rafter part with insulation and finishing coating, which corresponds to the historical era of the building's construction. The main task in the reconstruction of the roof was to create a safe and durable gutter that would make impossible for icicles to fall on the pedestrian area of Shevchenko Boulevard. We have used a hidden gutter on strong welded brackets that can withstand the huge weight of snow and ice during the formation of icicles. Drainpipes - rectangular section, external.